OREN-AC380V-60KW-R Resistive AC Load Bank
Why need load bank testing It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.
OREN-AC380V-500KW-R Resistive AC Load Bank
Why need load bank testing It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.
OREN-AC380V-200KW-R Resistive AC Load Bank
It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.
OREN-AC380V-30KW-R Resistive AC Load Bank
Why need load bank testing It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.
OR-AC380V-100KW-R Resistive AC Load Bank
Resistive load bank(AC Load Bank, Dummy Load Bank, Generator Load Bank, Load Bank for Generator Testing) is a device which can simulate the real-life resistive loads and provides a rigorous test regime for power supplies from 1kW to 60MW.