中文简体 English

Telephone: ++86 029-68229739

E-mail: sales@oren-electric.com

Current location: Home > Product
    1000KW  load bank

    1000KW load bank

    Resistive load bank(AC Load Bank, Dummy Load Bank, Generator Load Bank, Load Bank for Generator Testing) is a device which can simulate the real-life resistive loads and provides a rigorous test regime for power supplies from 1kW to 60MW. The “load” of a resistive load bank is created by the conversion of electrical energy to heat by power resistors. It mainly used to test and maintenance of Engine Generators, Storage Battery Systems, UPS Systems, Inverters, Ground Power Units, Auxiliary Power U

    400VAC 600KW- R Ac Load Bank

    400VAC 600KW- R Ac Load Bank

    Resistive load bank(AC Load Bank, Dummy Load Bank, Generator Load Bank, Load Bank for Generator Testing) is a device which can simulate the real-life resistive loads and provides a rigorous test regime for power supplies from 1kW to 60MW.

    Series Rack Mounted Load Banks

    Series Rack Mounted Load Banks

    Rack mounted resistive load bank is widely used in data center to simulate electric loads and dissipation of IT systems. These load banks are controlled by sectional steps with customized setting. Users could set power and time as per their needs with easy operation.

    OREN-DC2V-96V Battery Load Bank

    OREN-DC2V-96V Battery Load Bank

    Battery Discharger Tester focus on work for the capacity test of NiCD and Lead-acid storage battery as back-up power supply and store solar energy ,wind energy hydroenergy and so on . Cell battery voltage : 1.2V/2V/6V/12V Battery string voltage : 24V/48V/72V/80V/96V/110V/220V /380V/600V

    OREN-DC300V-650V Battery Load Bank

    OREN-DC300V-650V Battery Load Bank

    Battery Discharger Tester focus on work for the capacity test of NiCD and Lead-acid storage battery as back-up power supply and store solar energy ,wind energy hydroenergy and so on . Cell battery voltage : 1.2V/2V/6V/12V Battery string voltage : 24V/48V/72V/80V/96V/110V/220V /380V/600V

    OREN-DC10-480V-110A  Battery Load Bank

    OREN-DC10-480V-110A Battery Load Bank

    Battery Discharger Tester focus on work for the capacity test of NiCD and Lead-acid storage battery as back-up power supply and store solar energy ,wind energy hydroenergy and so on . Cell battery voltage : 1.2V/2V/6V/12V Battery string voltage : 24V/48V/72V/80V/96V/110V/220V /380V/600V

    OREN-DC10-300V-120A Battery Load Bank

    OREN-DC10-300V-120A Battery Load Bank

    Battery Discharger Tester focus on work for the capacity test of NiCD and Lead-acid storage battery as back-up power supply and store solar energy ,wind energy hydroenergy and so on . Cell battery voltage : 1.2V/2V/6V/12V Battery string voltage : 24V/48V/72V/80V/96V/110V/220V /380V/600V

    OREN-AC380V-60KW-R Resistive AC Load Bank

    OREN-AC380V-60KW-R Resistive AC Load Bank

    Why need load bank testing It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.

    OREN-AC380V-500KW-R Resistive AC Load Bank

    OREN-AC380V-500KW-R Resistive AC Load Bank

    Why need load bank testing It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.